Sunday, February 23, 2020

Note Cards Essay Example | Topics and Well Written Essays - 500 words

Note Cards - Essay Example Paraphase: According to Hammond (2002) it will take until 2024 before Britain can attain the same staffing levels as Europe, thus existing staff are ridiculously overburdened. (as cited in Fleming, 2006) Paraphrase: that this shortage has resulted in almost twenty percent of Canadians having trouble locating a doctor, together with a lack of other health professionals such as radiologists, psychiatrists and obstetricians. He further stated that almost two thirds of family doctors are refusing or limiting new patients. (Fleming, 2006) Paraphrase: The lack of doctors and nurses in Canada is quickly reaching crisis point; in 2004, one hospital in Vancouver was forced to farm out almost a thousand patients because of a shortage of nurses and in 2006 another hospital had to cease all surgery for over a week because of a lack of nurses (Fleming, 2006). Paraphrase and quote: The lack of equipment in Britain has â€Å"reduced availability and eroded quality† and in Canada over fifty percent of equipment is outdated and only when it no longer functions, is it replaced (Fleming, 2006). Paraphrase: In Canada, doctors are not able to work properly because of inadequate availability time of operating rooms, and the limitations placed on the number of patients they can operate on means that those deemed not crucial often have to wait years before receiving surgery. (Fleming, 2006) Paraphrase: a study conducted by Alter, Naylor, Austin, Chan and Tu in 2003, wherein thirty percent more people living in Alberta were able to receive heart surgery than those living in Prince Edward Island. Another study undertaken by Pilote et al. in 2004, found that in Nova Scotia patients have to wait three weeks longer for heart surgery after a heart attack, than those living in Alberta. People living in the north of England are more liable to die of cancer then those living in the south of England; those living in the north are

Friday, February 7, 2020

Failure of the project Essay Example | Topics and Well Written Essays - 750 words

Failure of the project - Essay Example Without the help of each group in the company any effort geared to boost the performance of a firm is set to fail. Laying off the experienced staff members and replacing them with temps. This is one of the worst decisions that the company made. Though the company will eventually lay off its entire experienced staff member due to mechanization, the company should have done this gradually in order for the staff to be familiar with the new system. Replacing experienced staff with temps became detrimental as these do not have knowledge on the operations and were probably not given training. Extremely low bids for projects. The company felt very secure in their new technology that even though their decisions would eventually led to the accumulation of huge losses, they still push through because they are desperate for new clients and deals and at the same time hoping that that these losses will be recovered by the new system. Company's reluctance to hear about problems regarding SAP. As the management became confident that SAP will be the cure of their present problems, they were not able to come up with contingency plans to answer what if situations. This implies that the management was not able to know the possible pitfalls in the system which needed to be addressed. Overlooked customer. ... As the customers were not served properly with the new system, its performance and overall image in the community suffered. Aside from these managerial decision pitfalls, the company's external environment also contributed to its demise. The bankruptcy of its largest customer Phar Mor, Inc. also became a significant factor. 2. Who was responsible' For example, what role did FoxMeyer's information technology group play in the failure' As described above, the management team of FoxMeyer largely contributed to the fall of the company due to the decision it implemented. The information technology group can also be responsible as it appears that it had not thoroughly determined the feasibility of using SAP in the company. Also, as problems were not identified in the new system, possible solutions were not laid out in response to problems encountered in the implementation. It is also worth mentioning that the company became nearsighted and was not able to apply the new technology at the right time. The case exemplified that the whole company is not yet ready and was not made ready by the management in adopting a more advanced technology to aid it in its operation.